Independent technical judgement on solar, wind, storage and grid assets, from the first screening to the last commissioning report. Local presence in five countries, and one senior expert who signs what they write.

Request a red flag review
Solar array with wind turbines beyond
1 GW+Technical due diligence completed
400 MW+Design and installation delivered
150 MWDevelopment pipeline, ongoing
100+Projects across the record
“A finding you can act on beats a checklist you cannot.”

Every megawatt on this line was reviewed by the person who signed the report.

Why we do it

Transforming energy for a sustainable future

Every asset we review moves capital towards energy that lasts. On the way there the unglamorous part decides everything: land, permits and the grid connection set the timetable, so we read those first.

Independence

We re-model the numbers. We do not inherit them.

Production, losses and availability are built from source in PVsyst and the tools the sector uses for the technology, and stated at P50 and P90. The seller’s file is evidence to be tested, never an input to be copied.

Technologies

Solar, wind, hydro, bioenergy, storage and the grid behind them

Battery and hybrid energy storage
StorageBattery and hybrid energy storage
Solar, wind and storage on the same site
Solar & windSolar, wind and storage on the same site
Grid connection, the longest lead time on most projects
GridGrid connection, the longest lead time on most projects
Questions

Before you commission

How quickly can a first read be delivered?

A red flag review lands within days of receiving access to the data room. A full technical due diligence runs four to six weeks depending on the size and state of the asset.

Do you produce the production figure yourselves?

Yes. The energy yield assessment is modelled independently in PVsyst and the tools the sector uses for the technology, and stated with confidence levels such as P50 and P90. We do not sell it as a standalone product: it is the number the whole business case rests on, so it belongs inside the feasibility study or the due diligence that has to defend it.

What does ready-to-build actually mean?

That the land rights, permits, grid connection and design are complete enough for construction to start. Where that line sits differs by country, which is why development timelines are quoted per market rather than in general.

Do you work as owner’s engineer during construction?

Yes, on a monthly basis for the duration of the works: design review, factory and site inspection, progress and payment verification, and acceptance testing through to commissioning.

Which technologies do you cover?

Solar PV, wind (onshore, offshore and floating), hydro, bioenergy, battery and hybrid energy storage, hybrid plants, and the grid connection work behind all of them.

Do you work outside your five markets?

Yes. We work internationally and travel to the asset. Five countries are where we also have people permanently on the ground.